Current Vacancy - Steel Authority of India
Current Vacancy - Steel Authority of India
Designation : DNB Trainees
Job Description :
Steel Authority of India (SAIL), conducts Walk-In-Interview for the post of DNB Trainees
Qualification : MBBS degree with Permanent Regn. with MCI / State Medical Council ii. Passed PG Diploma in the concerned specialty.
Stipend : Rs 21,834/-, Rs 22,579/- and Rs 23,326/- per month for 1st, 2nd & 3rd year respectively.
Application Fee : A Demand Draft (Non-refundable) for Rs. 40/- drawn in favour of “SAIL-Bokaro Steel Plant” payable at Bokaro Steel City.
Company Profile :
Hindustan Steel (HSL) was initially designed to manage only one plant that was coming up at Rourkela. For Bhilai and Durgapur Steel Plants, the preliminary work was done by the Iron and Steel Ministry. From April 1957, the supervision and control of these two steel plants were also transferred to Hindustan Steel. The registered office was originally in New Delhi. It moved to Calcutta in July 1956, and ultimately to Ranchi in December 1959.
The 1 MT phases of Bhilai and Rourkela Steel Plants were completed by the end of December 1961. The 1 MT phase of Durgapur Steel Plant was completed in January 1962 after commissioning of the Wheel and Axle plant. The crude steel production of HSL went up from .158 MT (1959-60) to 1.6 MT. A new steel company, Bokaro Steel Limited, was incorporated in January 1964 to construct and operate the steel plant at Bokaro.The second phase of Bhilai Steel Plant was completed in September 1967 after commissioning of the Wire Rod Mill. The last unit of the 1.8 MT phase of Rourkela - the Tandem Mill - was commissioned in February 1968, and the 1.6 MT stage of Durgapur Steel Plant was completed in August 1969 after commissioning of the Furnace in SMS. Thus, with the completion of the 2.5 MT stage at Bhilai, 1.8 MT at Rourkela and 1.6 MT at Durgapur, the total crude steel production capacity of HSL was raised to 3.7 MT in 1968-69 and subsequently to 4MT in 1972-73.
Desired Profile :
How to apply: Interested eligible candidates may Walk-in for interview, on 31/05/2011 (Tuesday), at 09:00 AM to 11:30 AM, in the Office of Director (M&HS), Bokaro General Hospital, Bokaro Steel City, with all the relevant documents (Originals + one set of photocopies) of Filled in Application in the prescribed Format with signature of candidate. MBBS certificate & mark-sheet of all years, PG Diploma pass certificate in the concerned specialty. Certificate of registration from Medical Council of India / State Medical Council. Age Certificate, Caste Certificate, NOC if employed in Govt. sector. Four passport size photographs.
Last Date : 31-05-2011 (Walkin)
Education: MBBS
Location : Bhillai
For More Details
Designation : DNB Trainees
Job Description :
Steel Authority of India (SAIL), conducts Walk-In-Interview for the post of DNB Trainees
Qualification : MBBS degree with Permanent Regn. with MCI / State Medical Council ii. Passed PG Diploma in the concerned specialty.
Stipend : Rs 21,834/-, Rs 22,579/- and Rs 23,326/- per month for 1st, 2nd & 3rd year respectively.
Application Fee : A Demand Draft (Non-refundable) for Rs. 40/- drawn in favour of “SAIL-Bokaro Steel Plant” payable at Bokaro Steel City.
Company Profile :
Hindustan Steel (HSL) was initially designed to manage only one plant that was coming up at Rourkela. For Bhilai and Durgapur Steel Plants, the preliminary work was done by the Iron and Steel Ministry. From April 1957, the supervision and control of these two steel plants were also transferred to Hindustan Steel. The registered office was originally in New Delhi. It moved to Calcutta in July 1956, and ultimately to Ranchi in December 1959.
The 1 MT phases of Bhilai and Rourkela Steel Plants were completed by the end of December 1961. The 1 MT phase of Durgapur Steel Plant was completed in January 1962 after commissioning of the Wheel and Axle plant. The crude steel production of HSL went up from .158 MT (1959-60) to 1.6 MT. A new steel company, Bokaro Steel Limited, was incorporated in January 1964 to construct and operate the steel plant at Bokaro.The second phase of Bhilai Steel Plant was completed in September 1967 after commissioning of the Wire Rod Mill. The last unit of the 1.8 MT phase of Rourkela - the Tandem Mill - was commissioned in February 1968, and the 1.6 MT stage of Durgapur Steel Plant was completed in August 1969 after commissioning of the Furnace in SMS. Thus, with the completion of the 2.5 MT stage at Bhilai, 1.8 MT at Rourkela and 1.6 MT at Durgapur, the total crude steel production capacity of HSL was raised to 3.7 MT in 1968-69 and subsequently to 4MT in 1972-73.
Desired Profile :
How to apply: Interested eligible candidates may Walk-in for interview, on 31/05/2011 (Tuesday), at 09:00 AM to 11:30 AM, in the Office of Director (M&HS), Bokaro General Hospital, Bokaro Steel City, with all the relevant documents (Originals + one set of photocopies) of Filled in Application in the prescribed Format with signature of candidate. MBBS certificate & mark-sheet of all years, PG Diploma pass certificate in the concerned specialty. Certificate of registration from Medical Council of India / State Medical Council. Age Certificate, Caste Certificate, NOC if employed in Govt. sector. Four passport size photographs.
Last Date : 31-05-2011 (Walkin)
Education: MBBS
Location : Bhillai
For More Details

