Current Vacancy - Steel Authority of India Limited
Current Vacancy - Steel Authority of India Limited
Designation: Sr. Registrar, Registrar, Houseman
Job Description :
Walk In Interview for Engagement as Houseman, Registrars/ Sr. Registrar in Bokaro Steel Plant, Bokaro Steel City on Stipendary Basis.
Si No. 1
Post Name: Sr. Registrar/ Registrar
No. of Post: 08 Posts
Qualification : For Senior Registrar: MMB with P.G. Degree, For Registrar: MBBS with PG Diploma or MBBS with 2 years experience.
Si No. 2
Post Name: Houseman
No. of Post: 17 Posts
Qualification : MBBS
Company Profile :
SAIL traces its origin to the formative years of an emerging nation - India. After independence the builders of modern India worked with a vision - to lay the infrastructure for rapid industrialisaton of the country. The steel sector was to propel the economic growth. Hindustan Steel Private Limited was set up on January 19, 1954.
Hindustan Steel (HSL) was initially designed to manage only one plant that was coming up at Rourkela. For Bhilai and Durgapur Steel Plants, the preliminary work was done by the Iron and Steel Ministry. From April 1957, the supervision and control of these two steel plants were also transferred to Hindustan Steel. The registered office was originally in New Delhi. It moved to Calcutta in July 1956, and ultimately to Ranchi in December 1959.
The 1 MT phases of Bhilai and Rourkela Steel Plants were completed by the end of December 1961. The 1 MT phase of Durgapur Steel Plant was completed in January 1962 after commissioning of the Wheel and Axle plant. The crude steel production of HSL went up from .158 MT (1959-60) to 1.6 MT. A new steel company, Bokaro Steel Limited, was incorporated in January 1964 to construct and operate the steel plant at Bokaro.The second phase of Bhilai Steel Plant was completed in September 1967 after commissioning of the Wire Rod Mill. The last unit of the 1.8 MT phase of Rourkela - the Tandem Mill - was commissioned in February 1968, and the 1.6 MT stage of Durgapur Steel Plant was completed in August 1969 after commissioning of the Furnace in SMS. Thus, with the completion of the 2.5 MT stage at Bhilai, 1.8 MT at Rourkela and 1.6 MT at Durgapur, the total crude steel production capacity of HSL was raised to 3.7 MT in 1968-69 and subsequently to 4MT in 1972-73.
Desired Profile:
How to Apply : Date of Interview: 19.07.2011 (Tuesday) at Office of Director (M&HS), Bokaro General Hospital, Bokaro Steel City
Last Date : 19 July 2011 (Walkin)
Eligibility : MBBS
Location : Jharkhand
For More Information: Click Here
Designation: Sr. Registrar, Registrar, Houseman
Job Description :
Walk In Interview for Engagement as Houseman, Registrars/ Sr. Registrar in Bokaro Steel Plant, Bokaro Steel City on Stipendary Basis.
Si No. 1
Post Name: Sr. Registrar/ Registrar
No. of Post: 08 Posts
Qualification : For Senior Registrar: MMB with P.G. Degree, For Registrar: MBBS with PG Diploma or MBBS with 2 years experience.
Si No. 2
Post Name: Houseman
No. of Post: 17 Posts
Qualification : MBBS
Company Profile :
SAIL traces its origin to the formative years of an emerging nation - India. After independence the builders of modern India worked with a vision - to lay the infrastructure for rapid industrialisaton of the country. The steel sector was to propel the economic growth. Hindustan Steel Private Limited was set up on January 19, 1954.
Hindustan Steel (HSL) was initially designed to manage only one plant that was coming up at Rourkela. For Bhilai and Durgapur Steel Plants, the preliminary work was done by the Iron and Steel Ministry. From April 1957, the supervision and control of these two steel plants were also transferred to Hindustan Steel. The registered office was originally in New Delhi. It moved to Calcutta in July 1956, and ultimately to Ranchi in December 1959.
The 1 MT phases of Bhilai and Rourkela Steel Plants were completed by the end of December 1961. The 1 MT phase of Durgapur Steel Plant was completed in January 1962 after commissioning of the Wheel and Axle plant. The crude steel production of HSL went up from .158 MT (1959-60) to 1.6 MT. A new steel company, Bokaro Steel Limited, was incorporated in January 1964 to construct and operate the steel plant at Bokaro.The second phase of Bhilai Steel Plant was completed in September 1967 after commissioning of the Wire Rod Mill. The last unit of the 1.8 MT phase of Rourkela - the Tandem Mill - was commissioned in February 1968, and the 1.6 MT stage of Durgapur Steel Plant was completed in August 1969 after commissioning of the Furnace in SMS. Thus, with the completion of the 2.5 MT stage at Bhilai, 1.8 MT at Rourkela and 1.6 MT at Durgapur, the total crude steel production capacity of HSL was raised to 3.7 MT in 1968-69 and subsequently to 4MT in 1972-73.
Desired Profile:
How to Apply : Date of Interview: 19.07.2011 (Tuesday) at Office of Director (M&HS), Bokaro General Hospital, Bokaro Steel City
Last Date : 19 July 2011 (Walkin)
Eligibility : MBBS
Location : Jharkhand
For More Information: Click Here